Sample Work Hub · Demo site · Live 3D
Now building in 3D — watch
CHAPTER 01 / 05 — THE LINE

First, it is a line.

Every Timber & Stone home starts as a single drawing. Keep scrolling — the line becomes land, the land becomes a foundation, and the foundation becomes a house.

▼ It builds on its own — scroll to take control · Drag the scene to look around · Tap a chapter to jump

Excavator breaking ground on the building plot
Excavation
02Breaking groundWeek 3–4
Foundation formwork lit up for the night pour
Night pour
03Poured at nightWeek 5–7
Timber frame rising two storeys
Frame & roof
04The frame goes upMonth 3–5
The finished stone and timber home at dusk
Handover
05Lights onMonth 14
Great room with walnut island and stone fireplace
Step inside
→Welcome homeThe great room

The real build · in 3D space

Fly through fourteen months.

01 / 05
0Sq ft — the featured build
0 moGround to keys
$0kAll-in build cost
0 yrStructural warranty

The build story

From empty ground to front door.

The same five chapters you just scrolled through in 3D — with the real site photos, a named foreman and a photo update every Friday.

The empty building plot at night, marked out and ready for the foundation pour
01

The land, as it was

Just ground, trees and a string line. We walk the plot with you, mark the corners of the house, and check sun, drainage and views before a single machine arrives.

Week 1–2Site surveyCorners staked
Excavator breaking ground and clearing soil on the residential building plot
02

Breaking ground

The excavator takes the first bite — in the 3D scene above, watch its arm work as you scroll. Topsoil is kept on site for the finished garden, and service trenches go in while the ground is open.

Week 3–4ExcavationServices in
Foundation steel and formwork lit up at night, ready for the concrete pour under a crescent moon
03

The foundation — poured at night

Concrete goes in before dawn, when it's cool and cures slow and strong. Steel, formwork and one very long night — this slab carries everything above it for the next hundred years.

Week 5–7Night pourEngineer signed off
Timber frame of the house rising two storeys high against a dramatic sky
04

The timber frame goes up

This is the week it stops looking like a building site. Beam by beam — exactly as the 3D frame assembles on scroll — two storeys rise in days and suddenly you can stand in your kitchen.

Month 3–5Frame & roofWalk-through #1
The finished home — stone, timber and glass glowing at dusk
05

The finished home

Stone cladding, timber siding, glass that catches the evening. Fourteen months after the string line, the same ground holds a house. Keys, warranties and a walk-through of every system — done.

Month 14Handover10-year warranty

Before / after

Same ground. Same camera.

Drag the handle. One photo is the foundation on pour night — the other is the same plot, fourteen months later.

After: the finished Timber & Stone home
Before: the foundation pour at night on the same ground
Before · Pour nightAfter · Month 14
⇔

Tip: drag anywhere on the photo, or use the slider underneath it.

Exterior Studio

Dress the house before we build it.

Pick the siding, stone and roof — the colours apply live to the 3D house at the top of this page, not just a picture. Choose, then tap “See it in 3D”.

Live in 3D

Your colours, on the real model.

Currently: Natural Cedar · Warm Limestone · Matte Black. Every swatch you tap recolours the 3D home above — siding, stone base and roof — and is written onto your build sheet in the planner.

Siding

Stone base

Roof & trim

Your elevationNatural Cedar · Warm Limestone · Matte BlackSaved to your build sheet in the planner below — and live on the 3D model.

Inside

Timber you can touch. Stone that holds the heat.

The great room of the featured build — a live-edge walnut island, a stacked-stone fireplace that runs two storeys, and blackened steel throughout.

Great room interior with live-edge walnut kitchen island, two-storey stacked stone fireplace and timber floors

The great room

One open volume for cooking, eating and the fire. The stone chimney breast is structural, not a veneer — it stores the day's heat and gives it back all evening.

  • Live-edge walnut
    Island and table tops, cut from a single tree per home.
  • Stacked fieldstone
    Fireplace and exterior base — the same stone, inside and out.
  • Blackened steel
    Window frames, pendants and stair rails, finished on site.

Build planner

What would yours cost — and how long?

Move the sliders. The featured build sits exactly where the reel left it: 4,200 sq ft, $1,785,000, 14 months.

Exterior from the Studio: Natural Cedar · Warm Limestone · Matte Black

Your estimate

$1,785,000
≈ 14 months, ground to keys
Cost per sq ft
$425
Design & permits phase
Months 1–2
Ground & foundation
Months 3–4
Frame, roof & exterior
Months 5–9
Interiors & handover
Final months

Guide estimate for the demo — a fixed quote follows a site visit and your finish selections. No surprises after signing: the price we quote is the price you pay.

Talk to a builder
01

Walk the land

A free site visit. We talk light, views and budget before any drawings — and tell you honestly if the plot fights the house you want.

02

Design & fix the price

Drawings, the Exterior Studio selections, and one fixed price. What you sign is what you pay.

03

Build, with proof

Friday photo updates from the same camera position — your own before/after slider, filling up week by week.

“We watched our house happen from two time zones away. Every Friday, the same photo — a little more house in it.”

— The featured build, handed over month 14
← Kaynat Umar · portfolio